National Repository of Grey Literature 33 records found  1 - 10nextend  jump to record: Search took 0.00 seconds. 
Fear
Pechánková, Petra ; Svobodová, Marta (referee) ; Cenek, Filip (advisor)
Scaffolding and videoprojection on the gallery floor act like challenge to watch videos from the right focus – from the top of the safoolding. Instalation should mostly force the audience to get in touch with situation, which is unbearable for someone, who is scared from the heights – acrophobic.
Realization of Construction of Firehouse in Ždírec nad Doubravou
Kazda, Jiří ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The master´s thesis describes the realization of new building of fire station in Ždírec nad Doubravou. The parts of the thesis are time and financial plan for all building objects, assessment of transport routes, design of site equipment and design of main machines. An itimized budget with a bill of quantities and a detailed construction schedule are prepared for the main building. A technological regulativ and quality control plan are prepared for the stage of industrial steelconcrete floor. In the end of the work, there is solved the noise study of construction and the topic of system infiltration tanks.
Price calculation of revolving material
Černý, Lukáš ; Výskala, Miloš (referee) ; Aigel, Petr (advisor)
The subjekt of bachelor thesis Calculation of station basis material is to analyze the cost of the material station basis. This thesis deals with variants of whether the material station basis, specifically scaffolding, better to own or rent it. There is evaluated, how many rotations are needed to make the investment back. The thesis analyzes and shows who belongs profit of calculation.
House with care service - Construction-technological project
Lysáková, Vanda ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The final thesis deals with the realization of house with care servise. It contains engineering report, site equioment with drawings. It includes a time schedule and budget. It also processes the technological note of scaffolding and monolithic ceiling constructions. It includes a control and test plann for scaffolding and monolithic ceiling construction, a noise study and crane assessment.
Residential building Šemberova, Brno - The solution phase realization of the envelope
Novák, Martin ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This Bachelor's thesis deals with the execution of the envelope residential building Šemberova. It concerns realization of the ventilated façade. In this Bachelor's thesis, the building technological project contains primarily a model of the building site accessories, the technological process, the time schedule, the financial heftiness, the machines formation, the check and the test plan, the occupational safety, for these technological phases.
Information System Generator
Falhar, Radek ; Hanáček, Petr (referee) ; Jurnečka, Peter (advisor)
Goal of this work is to design and implement too for passive code generation for specific information system framework. This framework is ZeroFramework that is targeted at client-server development of applications running on .NET platform. For code generation, T4 Scaffolding library is used, which allows to divide code generation logic into separate parts (scaffolders). This work is mainly concerned with design and implementation of those scaffolders and their linking with T4Scaffolding library. Results of this work are templates and logic for generation of files and classes, which implement logic needed for display, adding, modification and deletion of specific database entity.
Realization preparation University Centre in Zlín
Rokosová, Iva ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
Diploma thesis is focused on the preparation of the implementation of the University Centre in Zlín. The work includes building technology study and subsequent construction technology project. In this thesis, the aim was to determine the time, financial and material demands of the project, choose the optimum process of construction, ensure BOZP, make the proposal buildingsite for the individual stages, the calculation of costs of site preparation and select adequate mechanical the assembly. It was drafted fire assessments of buildings.
Realization of Reduction of Energy Consumption of Museum in Horni Studenec
Kazda, Jiří ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The bachelor thesis describes the realization of thermal insulation of Museum in Horni Studenec. The part of this stage is a montage of new windows and entrance doors, thermal insulation of foundation, plinth and external walls. The thermal insulation is designed using external thermal insulation composite system (ETICS). The thesis handles with technological prescription, assessment of transport itineraries, itimized budget with statement of quantities, design of site equipment, construction schedule, inventory of machines, control and test plan and occupational safety and health. In the last chapter of the thesis, there is described a mechanical anchoring system of thermal insulation, the comparison of the standard types and design of dowels, which are suitable for use in the realization of thermal insulation of the building facility.
Cost analysis of revolving material
Janás, Patrik ; Výskala, Miloslav (referee) ; Aigel, Petr (advisor)
Goal of bachelor thesis, Cost analysis of revolving material, is to execute analysis of materials focused on revolving materials. Theoretical part includes calculation of costs and description of individual revolving materials. In practical part are described factors affecting cost of rent, construction and deconstruction of formwork.
Building technological study of execute peripheral walls in administration building of company Geostav in Otrokovice
Vyoral, Martin ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
In this work is done building technological phase the installation for curtain wall office building fy GEOSTAV in Otrokovice. It contains a comprehensive section for the realization of this stage. It is therefore all about making ventilated facades. Stage design and building technology envelope in the thesis contains the technological steps for the following parts: building equipment, technological regulation for facade scaffolding and ventilated façade, schedule, mechanical assembly, inspection and test plan, safety.

National Repository of Grey Literature : 33 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.